TOYOTA PARTS WAREHOUSE CASE STUDY
We provided one of the biggest barrier installs of 2021 to the Toyota Parts Warehouse in Palmerston North. Across their entire warehouse, Astrolift supplied and installed the biggest single A-Safe flexible barrier installation in New Zealand.
Unlike steel barrier, the A-Safe flexible barrier provides longer-term protection for buildings, people and vehicles by absorbing and dispersing the kinetic energy of a vehicle’s impact.
"The scoping and planning stage was fantastic, we had lots of contact with the team through every stage. The install stage was really good, I’ve got nothing but good things to say about them. A-Safe barriers are fantastic, they are exactly what we wanted. We tried bolting all the different barriers to the ground and ran into them with forklifts and found the A-Safe barrier doesn’t leave a mark, and bounces back into position."
Mark McDowell | Assistant Manager
Toyota Parts Warehouse Palmerston North
Safety Barrier Products Installed